Wednesday, November 25, 2009

Gluing down the bottom

After gluing together the hull, I came to several decisions, one of them being that gluing is a pain in the ass.

Yesterday I glued down the bottom, and yes, gluing is still a pain in the ass. So much so, that I swore off building another glue-only boat next time, that I'll take fasteners thank you very much, this sucks!

This morning, when I peeked into the garage at my nemesis glue-job-boat, my heart softened a bit, and I feel a little better. But I came close-- In my mind I saw a big bonfire at one point.

Yesterday I smoothed out the seam between the two bottom pieces, scoured the chinelogs and BH's with a rasp to provide a rough gluing surface, planed the transom flat, and screwed the bottom down in place. This took a while, and I was so concerned getting it on straight that it went on straight, but offset by about 2mm or so. I realized this after I screwed it on. This is not a big problem, there's supposed to be a gap of 90mm between the buttstraps for the daggerboard trunk, and I left 95mm for just this scenario. Storer recommends placing the bottom on with the centerline marks on the inside, to line up with the centerline marks on the BH's. A good idea, but then I would lose out on the markings up top that showed where the edges of the boat were (bottom is overcut by 2omm) and they provided a good guide as to screw placement. A better idea would be to have a centerline on both sides. Needless to say, lots of crawling under the boat and back, and shifting the ply ever so slightly.

Screws were placed every 300mm (lines from lofting) and along the BH's (3 for 1+2, 5 for 3, 4, transom). This was insufficient as you shall see later on.


After the bottom was screwed on I made special note of where I had some larger than normal gaps between the bottom and the sides. In these areas I would apply extra glue. Everything appeared tight and for the most part, everything fit together really well. I was impressed.

Next up, I unscrewed the bow of the boat, lifting it with 2x4's. After pre-coating the chinelogs and bottom with unmixed epoxy (more crawling around under the boat), I applied what I thought was copious amounts of glue, using the ziploc-bag method which I still don't like, but it seemed to make the most amount of sense. Mixing the glue with the silica is still a bear, I still don't know how to judge how much silica to add so I eyeball it until I get the appropriate consistency. This takes time. Then, the application. 3 pumps of resin with 1.5 pumps of hardener covered approximately- maybe- 4 feet. Hardly anything. This was going to take a lot of glue.

I moved down the line, sending the 2x4's down to the stern and gluing and screwing in their wake.

(notice me mixing always mixing more mixing in background with knee pads that didn't come off between 10am and 11pm)

I think I made 3 moves aft, covering large sections at a time. The port bow had a little bit of a gap between the bottom and the side, and needed even more glue. This was going to take a lot of glue, as I mentioned before. This is when I started getting frustrated. When I put too much glue during the BH construction phase, it poured out all over the place and was a giant mess. Now, I was putting large amounts of glue onto the chinelogs and when the bottom came down, nothing. No excess squeezage, nothing. Let me just say this: Gluing the bottom takes a lot more glue than you think it will.

About halfway down, I realized I forgot to line the sides with packing tape to ease clean-up. SOB. So I had glue dripping down around the bow, which means I'll be sanding forever. Out came the packaging tape around the aft sections and the transom. By this time my wonderful wife took pity on me and she applied the glue while I mixed it. This doubled the speed of the operation, since mixing takes a long time-- at 3 pumps of resin per bag, there was a lot of mixing to do. She has a knack for how much glue to apply and when we screwed down her end, a perfect amount squeezed out. Damn.

With all the screws down (she held up the stern bottom and gently lowered it as I screwed it down moving aft), we inspected for a gaps. There were a couple small ones along the chine, and a few gaps that needed more screwed to hold the ply down. I would recommend a screw every 200mm at least, as opposed to every 300mm.

Then we flipped her over:






Hot damn, I have a completed hull (above pics are after the "clean-up" (used loosely)).

Clean-up was a super pain in the ass, by this time a lot of my squeegees were gluey and tacky and my rags were used up and I was running out of mixing cups and no matter how many new gloves I put on, I was sticking to everything. Some glue was firming up nice, which meant a struggle to clean it up as is smeared everywhere. Be ready to spend some serious time bent inside the boat cleaning it up. My glue station aftermath:

This took me a few hours of prep, followed by about 7 hours of gluing/cleaning up. Solo, it was slow going, no doubt.

The bottom is still not done, I have to trim the excess off, which will be another pain because it's covered in rock-hard epoxy, but as far as I'm concerned, the big jobs in this are completed. From now on things can be accomplished in short spurts as opposed to 12hr marathon sessions. Thank goodness. I'm tired.

Did I mention this takes a lot more glue than you may think?

Monday, November 23, 2009

Bottom surprise! and limber holes and gaps filled

Today I overturned my bottom after gluing it last night. I was all very nice and neat and did my best and I was welcomed to see the fair bottom of my speed-demon boat with THIS:


HELLO DRAG. A giant glue mess that I will have to sand smooth. Which, if I estimate correctly, will take forever and a half. I shoulda woulda coulda put packaging tape around the seam, but my side panel job came out so neat (probably because I didn't put glue between the panels) that I didn't think I would see this. Also, note the glaring holes from my finishing nails that I used to pin the buttstraps in place. SOB, I went right through the ply. This is very embarrasing, I haven't gone through the ply anywhere where I didn't want to, this is the first time, and I have no idea how I did it. Again, I didn't do it on the side panels, so why now?

In other news, I planed down the new shims that will fill the gap between the bottom and the BH's, and cut/chiselled some limber holes. They look nice and neat from this angle because the ply is on the other side, which is all chipped up. I shoulda woulda coulda dammit scored the ply to get nice smooth cuts first, before going after it with my chisel.


Notice the stringy thing coming out of the limber hole... that's some fabric coming out from IN BETWEEN the layers of the ply! OOOooooooooh, mystery!

You may also notice the cloudy color, that because I've sanded the layer of epoxy there in preparation for bottom being glued on. I've decided to put in mini fillets along the BH's and the bottom for practice and to re-enforce the double seam, one between the bottom and the spacer, and the on between the spacer and the bottom of the BH frame.

Sunday, November 22, 2009

Filling gaps b/w BH's and gluing bottom

Today was spent filling in the gaps around the BH's. The first gaps to be filled were the ones in the notches between the chinelog and the BH's... the intrepid reader will remember I cut them too deep laterally. My wonderful wife who proved very adept at filling gaps around the stem went right to work on these notches, filling them with epoxy and shaping them with ply wrapped with packaging tape.


Once that was set, we glued on cedar spacers to fill the gaps between the bottom frame of the BH's and the bottom of the boat, which appeared because my notches in the BH's were too shallow, despite careful measuring. I didn't fool with cutting down the spacers before placing them, I glued them in place and I'll plane them down to match. I wanted to make sure to do the repair correctly rather than eyeball a piece that would look like it fit.



Finally, I glued together the two halves of the bottom. Very self explanatory. Shooting for gluing the bottom on Tuesday.




Tuesday, November 17, 2009

More gaps-- between BH's and bottom

Today I planed down the chinelogs to flat, in order to fit the bottom at some point in the near future. Unfortunately for me, something somewhere didn't add up.

When I cut the notches in my BH's, I was very careful to use an actual slice from my chinelog to trace a pattern for the notch. Somehow, my notches were too deep laterally, I have gaps there that need filling. Today I now realize that they are also too shallow vertically... after planing the chinelogs flat, I have a gap between the bottom of the BH's and the chinelog. Take note from BH3:


When I fit the bottom onto the boat, the gap is clear (boat is upside down):


This is especially frustrating because:

1: I measured the notches using an actual piece from the chinelog
2: I was very careful to do my best eye-balling job that the bottom of the ply appeared to meet the bottom of the BH's

In retrospect I should have:

1: After the dry-fit turn the hull upside down to get a good look at what was going on
2: Do a test plane portion to see where a flat chinelog ends up in relation to the BH's

So now I can do one of three things:

1: Fill the gap with loads and loads of epoxy when I put on the bottom
- Risky because I could deform the bottom if I screw too hard placing it into position
2: Fill the gap with a strip of wood that is painstakingly cut and glued into place
-Annoying work, AND it won't match the BH bottom frame
3: Continue to plane down the chinelogs until they match the BH's.
-I lose freeboard AND it could make the boat too wide at the bottom and the pre-cut ply for the bottom won't be able to accomodate the new width.

For all it's worth, here's the boat with the bottom kinda on:


I've just decided that solution #3 is not a good one.

I have now just decided to go with option #2.

Interestingly enough, BH1 came out perfect!... WTF, Over?

Saturday, November 14, 2009

Filling stem gap w/ a fillet

Yesterday I glued the boat together and was stymied at the end with a gap that had appeared between the sides of the ply and the stem. See picture in previous post. My wife came in and suggested using an icing pipe thing-a-ma-jig, much like many people use ziploc bags. I've used ziploc bags in the past and found them somewhat cumbersome to use, but most importantly, I really wanted to get epoxy deep into the crevasse to maximize bonding.

So she jigged up a icing pipe and lined it with packing tape so we could re-use it, and then, using the patient steady hand of a culinary expert, she filled in the voids around the stem and made a nice fillet. Damn! What a woman!


In other news, I crawled underneath the stem to cut away some epoxy and saw this:


When I was dry-fitting the boat last week for the first time I heard some ***crack***ing noises, and since I didnt' see anything, I figured it was some epoxy somewhere settling or what-have-you. NOPE it was the chine logs right where they abut the stem. You'll notice the taper I put in to give them some room to fit together, and you'll also notice where the wood actually separated from itself. The glued face stayed firm to the plywood, which makes me feel like my gluing jobs are satisfactory. I'm bummed the wood split, but again, this whole area will be filled with epoxy and all will be good with the world again.